Mitsubishi Electronics SW1DNC-GXW2-E Water System User Manual


 
3.2.6 Creating a program
3 - 17
1
OVERVIEW
2
CREATED PROGRAM
AND SYSTEM
CONFIGURATION
3
CREATING PROGRAM IN
STRUCTURED LADDER/
FBD LANGUAGE
4
CREATING
PROGRAM IN ST
LANGUAGE
5
CREATING TWO OR
MORE PROGRAM
BLOCKS
3.2 Creating a Project
16.Click (Open Contact) on the Structured
Ladder/FBD toolbar, and then move the cursor
to a desired position to display an open contact
there.
Click the open contact to connect it with the left bus
line and enable setting of a variable.
Settings
Variable: X2
17.Select "Function" "MOVP" on the Function
Block Selection window, drag it, and drop it in a
desired position to position "MOVP" there.
Draw a grid line on the left figure (position 1) using
the procedure described in the step 3.
Click "?" of "s" and "d", and set the input and output
variables.
Settings
•s: 20
•d: VAR1
*1
*1: The label VAR1 is set in Section 3.2.5.
Input variable "s" Output variable "d"
1)
(To the next page)