5 - 4
5.2.1 Starting GX Works2
5 CREATING TWO OR MORE PROGRAM BLOCKS
GX Works2
5.2 Creating a Project
Create projects for the tea pouring operation, water refilling operation and warning indicating operation using
Structured Ladder program.
5.2.1 Starting GX Works2
Refer to the following section for the GX Works2 startup procedure:
3.2.1 Starting GX Works2
5.2.2 Screen configuration in GX Works2
Refer to the following section for the GX Works2 screen configuration:
3.2.2 Screen configuration in GX Works2
5.2.3 Creating a new project
Refer to the following section for the new project creation procedure:
3.2.3 Creating a new project
5.2.4 Setting parameters
Refer to the following section for the parameter setting procedure:
3.2.4 Setting parameters
Refer to the following manuals for the details on parameter setting:
GX Works2 Version 1 Operating Manual (Common)
CPU Manual
CPU Programming manual