STP-H600/H1000 Series Instruction Manual
2.2 Unpacking the STP Control Unit
Check the following before unpacking the STP control unit.
1) Check the package for bruises, breakage, wetness, etc.
If there is any abnormality/error or it is judged necessary to return the product, contact
Seiko Seiki.
2) Check the contents of the package.
See Section 16.3, "Accessories."
C
A
U
TI
O
N
The mass of the STP control unit is approx. 40 kg. Use a crane or appropriate
means to lift the STP control unit.
Lift the STP control unit using the two handles attached to the front panel.
Observe national laws/regulations, safety standards and so on when lifting the
STP control unit.
Use a crane or appropriate means sufficient enough to withstand the load when
lifting the STP control unit.
Always lift the STP control unit in stable places free of excessive shock or
vibration to prevent it from shaking or dropping.
Have at least two people lift the STP control unit when doing so by hand.
NOTICE
It is recommended to keep the packaging materials, such as the corrugated
fiberboard container and cushioning material for possible reuse.
2-2