Seiko Instruments MT-17E-003-D Heat Pump User Manual


 
STP-H600/H1000 Series Instruction Manual
2 Unpacking
2.1 Unpacking the STP Pump
Check the following before unpacking the STP pump.
1) Check the package for bruises, breakage, wetness, etc.
If there is any abnormality/error or it is judged necessary to return the product, contact
Seiko Seiki.
2) Check the contents of the package.
See Section 16.3, "Accessories."
C
A
U
TI
O
N
The mass of the STP pump is approx. 30 kg. Use a crane or other appropriate
means to lift the STP pump.
Lift the STP pump with an eyebolt or a similar tool that uses the fitting hole
attached to the inlet port flange.
Lift it with the aid of a suspension tool under the base when installing the STP
pump without fitting hole.
Observe national laws/regulations, safety standards and so on when lifting the
STP pump.
Use a crane or other appropriate means sufficient enough to withstand the load
when lifting the STP pump.
Always lift the STP pump in stable places free of excessive shock or vibration to
prevent it from shaking or dropping.
Have at least two people lift the STP pump when doing so by hand.
NOTICE
Be careful not to scratch the flange of the STP pump.
Before installing the STP pump, check whether or not there are scratches on the
surface.
It is recommended to keep the packaging materials, such as the corrugated
fiberboard container and cushioning material for possible reuse.
Figure 2.1 Example of Lifting the STP Pump
2-1