Seiko Instruments MT-17E-003-D Heat Pump User Manual


 
STP-H600/H1000 Series Instruction Manual
(9) Battery Instruction Label
This label instructs operators to replace batteries once a year.
The next replacement date of batteries is specified upon delivery of the STP pump.
Record the next replacement date (after one year) of batteries in the blank of the label when
replacing them.
This label describes precautions for use of external batteries.
(10) Rotational Direction Instruction Label
This label describes the rotational direction of the STP pump.
The STP pump rotates in this direction.
ROTATION
(11) Voltage Rating Label
This label describes the rated voltage of the STP control unit.
Use voltage specified in this label.
200 240V
1-5