3Com DUA3700-0BAA04 Plumbing Product User Manual


 
4-8
C
HAPTER
4: I
NSTALLING
AND
C
ONNECTING
C
ORE
B
UILDER
M
ODULES
LECS topology database (including: LES list and addresses, ELAN
names, connection type)
Static ATM addresses
PVC configurations, UNI version, UNI profile, signaling.
The switch is now operational.
Setting up Switch
Module Redundancy
and LANE
Redundancy
This section presents a procedure for setting up both switch module
hardware redundancy and LANE redundancy in the same session. Both
the LMA and the Transcend Enterprise Manager are used.
General Description of the Procedure
The following is a general description of the procedure for orientation
purposes only. When you perform the procedure, use the detailed steps
in the following sections.
1
Install both switches in chassis and run RESETCFG.BAT on each one.
Connect Ethernet ports of each switch module and install at least one
interface card in the chassis.
2
Configure the first switch using the Integrated Fast Setup of the LMA and
do not reboot the switch in the Integrated Fast Setup.
3
Reboot the switch after one minute using the LMA menu.
4
Answer “no” to the prompt “Erase the setup parameters?” and use the
LMA to check that all configuration parameters (i.e., database, IP, NNI
etc.) have passed successfully to the second switch module.
5
Configure LANE redundancy in the first switch using the Transcend
Backbone and Services Setup window and close the window when
finished.
6
Reboot the switch after one minute
7
Configure LANE redundancy in the second switch module using the
Transcend Backbone and Services Setup window and close the window
when finished.
8
After one minute use the MIB browser to check the LECS order list and
the Backbone and Services Setup window to check the LECS database.
9
Reboot the box.
10
Check the second switch using the MIB browser to check the LECS order
list and the Backbone and Services Setup window to check the LECS
database.