Barco R9843500 Pet Fence User Manual


 
12. Operating AutoGeometry: Warp display
Image 12-9
Starting the realignment process
4. In the appearing AutoG eometry dialog do either of the following:
-pressSelected Grou p to run the warp realignment process to all projectors of the selected group;
-pressSelected Projector to run the warp realignment process to the selected projector(s) of the selected group;
-pressCan cel to abort the realignment process.
Image 12-10
Group selected for the realignment process
Note: If different head locations were used during the denition of AutoG eometry positions, the user will be prompted to move
the AutoAlignment Head to th e appropriate locations physically during the AutoG eom etry capture process.
Image 12-11
5. Verify the AutoAlignment Head location and do either of the following:
- if at the correct location press Yes in the A utoGeom etry dialog to proceed;
- if not at the correct location, then physically position the AutoAlignment Head to the correct location and then press Yes in the
AutoGeometry dialog to proceed.
6. Wait until the warp realignment process is completed, it may take several min
utes to complete the process.
Image 12-12
Warp Realignment process is in progress
7. In the appearing Conrm Warp Realignment dialog, press Yes to store the warp realigned data on the projector(s) selected for
the warp realignment.
140
R59770509 AUTOALIGNMENT HEAD GEN II 26/11/2013