36
7. Step 4:
Implementing annual/weekly schedules
With the G-50A main unit, weekly schedules can be implemented. However, when registering for a
separate license (Annual/Weeky schedule), multifunctional weekly schedules and annual schedules can be
performed. Please refer to section 2,3 for function licence.
License registration
Setting
registration
Weekly schedule
Monthly schedule
Day schedule
Not required
For each G-50A unit, set using the G-50A
No. of operation per day: 6 times
(ON/OFF each 3 times)
Operation items:
Start/stop, set temperature, remote
controller prohibition
Time setting unit: 10 minutes
Operation subjects: only groups*
1
* No. of operations is 3 times each for
[Start/stop] and
[prohibition/permission] (total 12
times)
* Operation settings are 3 times/day
* Operation items must be set
together with [Operation]
Not possible
Not possible
Required
For each G-50A unit, set using the
web monitoring PC
No. of operation per day: 12 times
Operation items:
Start/stop, set temperature, operation
mode, local remote controller
prohibition/permission
Time setting unit: 1 minute
Operation subjects: groups, blocks,
all groups
* Settings are possible 12 times/day
* Operation items extend to [Set
temperature only] and [Operation
mode only]
Required
Set using the TG-2000A software
No. of operation per day: 12 times
Operation items:
Start/stop, set temperature, operation
mode, local remote controller
prohibition/permission
Time setting unit: 1 minute
Operation subjects: groups, (all)
floors blocks, Whole building
Pattern: possible to set for 2 patterns
for Summer/Winter
* Settings are possible 12 times/day
Operation items extend to [Set
temperature only] and [Operation
mode only]
G-50A Web monitoring
Day schedule can be changed without changing the weekly schedules or the
annual schedules.
Possible to set for 24 months and 50 days ahead (including this month)
No. of pattern: 5 patterns
TG-2000A
1
12
2002 2003 2004
23456
456789 12 10111212···10 11 123
This month
Setting range (24 months)
*1 After registering Annual/Weekly schedule, G-50A’s weekly schedule will not operate.
(1) What is the weekly schedule?
This term refers to the operation schedule of each day of the week.
(2) What is the annual schedule?
Deviating from the weekly schedule, for special days (including commemoration days and holidays) a
different schedule can be set for a maximum of 50 days up to 24 months (including this month) in
advance.
During the days set, the weekly schedule settings will not be implemented while the schedule set in the
annual schedule will be implemented.
(3) What is the day schedule?
After setting the weekly and annual schedules, the day schedule can be used for sudden changes in the
regular schedule.
When the day schedule is set, the weekly and annual schedule settings will not be implemented.
However, from the following day operations will be resumed according to the settings of the weekly and
annual schedules.