HP (Hewlett-Packard) 3.2.1 Water System User Manual


 
Figure 2-1 Interconnection Diagram for a Small HP XC Cluster of Server Blades
Enclosure 4
May be any managed
GigE switch supported
by CP
ProCurve managed
GigE Switch
ProCurve managed
GigE Switch
Enclosure 1
Switch 1
Enclosure 1
Server Blades
NIC1
Enclosure 2
Server Blades
NIC1
Enclosure 3
Server Blades
NIC1
Enclosure 4
Server Blades
NIC1
Primary OA Ext LinkSecondary OA Ext Link
GigE Switch
Enclosure 3
Primary OA Ext LinkSecondary OA Ext Link
GigE Switch
Enclosure 2
Primary OA Ext LinkSecondary OA Ext Link
GigE Switch
Enclosure 1
Primary OA Ext LinkSecondary OA Ext Link
GigE Switch
Enclosure 2
Switch 1
Enclosure 3
Switch 1
Enclosure 4
Switch 1
Enclosure 1
OA
Enclosure 2
OA
Enclosure 3
OA
Enclosure 4
OA
Medium Sized HP XC Cluster of Server Blades
Figure 2-2 (page 36) provides two illustrations of a medium sized HP XC cluster of 32 enclosures
and a maximum of 512 nodes.
The top portion shows a Gigabit Ethernet switch (a ProCurve 2848) that is connected to the
enclosure switch in bay 1 of each enclosure as well as to a ProCurve 2650 switch that connects
to the Onboard Administrator external link of each enclosure.
The bottom portion provides some additional detail. It shows the ProCurve managed Gigabit
Ethernet switch connected to the Gigabit Ethernet switch of each enclosure and to a ProCurve
2650 switch, which connects the Primary Onboard Administrator External Link of each enclosure.