Agilent Technologies 1100 Series Water Pump User Manual


 
22
Installing the Pump
Installing the Quaternary Pump
Installing the Quaternary Pump
1 Place the quaternary pump on the bench in a horizontal position.
2 Ensure the power switch on the front of the quaternary pump is OFF (switch
stands out).
Figure 3 Front of Quaternary Pump
3 At the rear of the quaternary pump move the security lever to its maximum
right position.
4 Connect the power cable to the power connector at the rear of the quaternary
pump. The security lever will prevent that the cover is opened while the power
cord is connected to the quaternary pump.
5 Connect the required interface cables to the quaternary pump.
Preparations Locate bench space.
Provide power connections.
Unpack the pump.
Parts required Pump
Power cord, for other cables see text below and Cable Overview on page 181
ChemStation and/or Control Module G1323A/B
S
tatus Lamp
Power Switch
Serial number