Agilent Technologies 1100 Series Water Pump User Manual


 
17
Installing the Pump
Unpacking the Quaternary Pump
Unpacking the Quaternary Pump
Damaged Packaging
Upon receipt of your quaternary pump, inspect the shipping containers for
any signs of damage. If the containers or cushioning material are damaged,
save them until the contents have been checked for completeness and the
quaternary pump has been mechanically and electrically checked. If the
shipping container or cushioning material is damaged, notify the carrier and
save the shipping material for the carrier’s inspection.
CAUTION If there are signs of damage to the quaternary pump, please do not attempt to
install the quaternary pump.
Delivery Checklist
Ensure all parts and materials have been delivered with the quaternary pump.
The delivery checklist is shown in Table 2. To aid in parts identification,
please see Chapter 5 “Parts and Materials”. Please report missing or damaged
parts to your local Agilent Technologies sales and service office.
Table 2 Quaternary Pump Checklist
Description Quantity
Quaternary pump 1
Solvent cabinet 1 (5062-8581)
Solvent bottles 4 (3 transparent 9301-1420, 1 amber 9301-1450)
Bottle head assembly 4 (G1311-60003)
Waste tube, purge valve 1 (5042-2461, reorder number, 5m)
Vacuum degasser 1
Solvent tubes for the
degasser
4 (G1322-67300)
Power cables 2