Mitsubishi Electronics TG-2000A Air Conditioner User Manual


 
64
9.5.2 Remedial apportioning setting screen
(1) Check the items necessary for remedial apportioning.
When charging is not apportioned, the charging data is destroyed, etc., the air-conditioning charge can
be calculated by a simple method.
The items which must be set depend on the assumed case and the charging configuration. The table
below shows which setting items are required and are not required.
(2) Set the remedial apportioning setting items.
(3)
[Procedure]
1) Click [Remedial apportioning setting] button.
Click the [Remedial apportioning] button in the initial
window. The remedial apportioning setting screen
appears.
2) Set the apportioning interval (Calculation).
Use click and the
/
buttons to set the interval to be
calculated by this remedial apportioning. An interval from
the previous day to the past 122 days can be set.
3) Set the total air-conditioning charge.
Set the settlement-of-accounts term total air-conditioning
charge. When the standard charge is included, the total
air-conditioning charge also includes the standard charge
for 1 month.
*Numbers can be manually input.
4) Select the standard charge setting.
When the settlement-of-accounts term is 1 month, whether or not the standard charge is to be
included can be selected. Select [Include] or [Not include] with the option button.
5) Set the remedial apportioning interval.
Use click and the
/
buttons to set the remedial interval dates.
6) Set the power integrated value.
Displays the power integrated value at 00:00 hours of the remedial apportioning start day. (The
integrated value at 24:00 hours of the previous day.) Select the
field of the watt hour meter you want
to change with the mouse and set or change the power integrated value. The integrated value field of
the selected watt hour meter changes to a blue cell. When the integrated value data changes, the new
data is displayed in blue.
Assumed case
Charging
configuration
Settlement-
of-a
ccounts
term
Total air-
conditioning
charge
Standard
charge
Remedial
apportioning
interVal
Power
integrated
Value
Remark
1 system V V *1 V V HDD failure
(no backup)
Multiple systems
V V V *1 V V
See sec
.
9.5.3
1 system V V *1 V HDD failure
(backup)
Multiple systems
V V V *1 V
See sec
.
9.5.4
1 system V V *1 V Computer crash
Multiple systems
V V V *1 V
See sec
.
9.5.5
1 system V V *1 V V *2
Watt hour meter
failur
e (Monitoring
impossible)
Multiple systems
V V V *1 V V *2
See sec
.
9.5.6
1 system V V *1 V V *2
System information
setting error
Multiple systems
V V V *1 V V *2
See sec
.
9.5.7
V shows that the item must be set.
*1 When the settlement-of-accounts term is 1 month, the standard charge can be set.
MoreoVer, when remedial apportioning including the standard charge is not performed, it cannot be reflected
in the air-conditioning charge result.
*2 The power integrated Value may haVe to be set depending on the failure cause or the contents of the setting
error.
Remedial apportioning setting screen