53
9.1 Result of Air-conditioning Charge Calculation
Air-conditioning charge calculation by the proportionally divided power charge function is based on the
indoor unit operation amount data. When data cannot be collected and calculation is unmatched for
some reason, irregular processing is performed. “Maintenance of charge data” and “Remedial
apportioning setting” may be necessary depending on the contents of this irregular processing.
The table below shows assumed cases.
Table:Assumed cases and recovery method (For Without WHM connection proportionally divided
power charge (manual input of the electric amount))
Assumed case
Air-
conditioning energy
monitoring screen
Charging data status Correction method
PC failure
(HDD failure)
(Display impossible) Charging data destroyed Operation amount data monitor
+ Charging parameter output
+ Charging data maintenance
*1
PC failure Red characters (abnormal)
G-
50A communication
error
Red characters (abnormal)
Forwarded to next day and apportioned
to recovery day
(Collected for several days and
apportioned)
No repair is required.
*2
G-50Amain unit failure
Black characters (normal)
Apportioned, but data is not correct
(Interval: Error day ~ recovery data)
Charging data maintenance
System information
setting error
Black characters (normal)
Apportioned based on set information
Charging data maintenance
*1: For repair, the operation amount for the repair period is monitored to output the CSV file upon the
output of the charge parameter. The proportional division parameter is found by calculating it from
the values of the difference and the capacity. The parameter is input through the charge data
maintenance, by which the charge data can be repaired.
*2:When a forwarding that extends past the settlement-of-accounts day occurs, it is recommended to
correct it in the “Charge data maintenance” screen. It is unnecessary to perform this procedure when
there is an agreement that allows the charge to be collected, even if the forwarded settlement occurs.
Table:Assumed cases and recovery method (For With WHM connection proportionally divided
power charge (direct fetching of the electric amount to the PC))
Assumed case
Air-
conditioning energy
monitoring screen
Charging data status Correction method
PC failure (HDD failure)
(Display impo
ssible)
Charging data destroyed Remedial apportioning
PC failure
(with backup)
Red characters (abnormal)
Watt hour meter failure
(Monitoring impossible)
Red characters (abnormal)
Charging data is abnormal and cannot
be apportioned
(Interval: Last backup day ~ recovery day)
Remedial apportioning
Watt hour meter failure
(Monitoring possible)
Red characters (abnormal)
Forwarded to next day and apportioned
to recovery day
(Data may not be correct)
Charging data maintenance
G-50A com
munication
error
Red characters (abnormal)
Forwarded to next day and apportioned
to recovery day
(Collected for several days and apportioned)
(Unnecessary)
*1
G-50A main unit failure
Black characters (normal)
Apportioned, but data is not correct
(Interval: Error day ~ recovery data)
Charging data maintenance
Calculation unmatch
Black/red characters
(Normal/abnormal)
Irregular processing performed and
apportioned or forwarded to next day
(Unnecessary)
*1
System information
setting error
Black characters (normal)
Apportioned based on set information
Charging data maintenance
Note:
• If there are two or more assumed cases, make overall judgment.
• When forwarding of apportionment spans the settlement-of-
accounts day, the forwarded portion is
added to the next month. When you want to separate this
month’s portion and next month’s portion,
divide the proportion division parameter forwarded and collected by “Charge data m
aintenance”
screen by the number of days in next month and this month.
• The charge data status is irregularly processed according to the case which occurred.
9. Charge Data Correction and Remedy