28
2) Set the IP address.
Input the IP address for the number of G-50A units to be connected.
Set the IP address for the number of G-50A units connected.
3) After completing the setting, press the [OK] button.
After fully completing the IP address set-up for the G-50A units, set the [OK] button, by which the
G-50A connection setting is completed.
* When the [Cancel] button is clicked, this setting is terminated to return to the initial screen.
Monitor the optional functions being used.
[Procedure]
1) Select the G-50 No.
Select the G-50A No. desired to monitor the optional function used with the “
/
“ buttons.
2) Select the [Update] button.
When the [Update] button located on the IP address screen of the G-50A is clicked, the result is
displayed.
8.6 System Configuration Set-up
Set the information of the air-conditioning system to be monitored using this integrated software
TG-2000A. It is possible for this setting to monitor the system information possessed by the G-50A.
8.6.1 Setting Procedure and Restrictions
Confirm the precautions and procedure before setting the system configuration.
Perform the confirmation before setting the
system configuration.
[Procedure]
1) Select the [System configuration set-up] button.
Click the [System configuration set-up] button
located in the system setting group on the initial
window.
2) Select the [OK] button after confirming the
display contents.
Check the contents of the alarm displayed.
When there are not any problems found, click
the [OK] button to advance to the setting.
* When the [Cancel] button is clicked, this setting
is terminated to return to the initial screen.
Execute the System configuration set-up in accordance with the following procedure.
Step 1: G-50 data collection
Step 2: Unit composition of G-50
Step 3: Set-up of refrigerant system
Step 4: Set-up of group
Step 5: Interlocked setting
Note:
• It is necessary to set the IP address for the G-50A using the G-50A
main unit or initial setting tool.
Note:
• It is possible to monitor the optional function of the G-50A
, and to confirm whether the license
desired to be used for the integrated software TG-2000A is registered (exists).
Web monitor :
Required when the monitor operation is executed, using this
TG-2000A and the Web.
Annual/weekly schedule: Required when the schedule setting is used.
(Schedule)
Charge : Required when the Charge calculation (charging function)
is
used. (It is also required when the operation time is used.)
Sending error mail : Required when the error mail addressing is used.
(Mail) (It is prepared for service maintenance.)
Preparation screen
(Charge calculation)
(Monitor/Operation)