6-2 l Operation and Daily Maintenance
Operation and Daily Maintenance
Starting and Stopping
The main switch is located beneath the control panel on the front
of the granulator.
Starting and stopping is controlled by push buttons on the control panel.
NOTE: Never stop the granulator before all material in
the hopper and cutter housing is completely granulated.
Residual material will clog the rotor in the granulator during re-start.
The motor will be overloaded and the overloading protection will
trigger.
✐
Start Emergency
stop
Main switch
Stop