Conair CHS-810 Plumbing Product User Manual


 
Installation l 5-5
5
Installation
Closing the Screen Box, Granule Bin and Hopper
NOTE: Before closing, make sure that the mating
surfaces are clean!
There is a pinch risk during closing, be careful.
Close the screen box and install the granule bin
1
Make sure that the screen is correctly
positioned in the screen box.
2 Lift the screen box up and tighten the
star knobs properly to stop.
3 Install the granule bin.
4 Install the extraction pipe.
Alt. CF machine with extraction fan, do up the quick
coupling (D) on the outlet pipe stub.
5 Close the door.
Close the hopper
1
Check and make sure that
no granulate lies on the
mating surfaces or flanges.
2 Shut/fold back the hopper.
3 Open and make sure that the
tipping catch falls into the cutout.
4 Lock the hopper with the star knobs, tighten
the star knobs properly to stop.
5 Switch the main switch “On”.
6 Start the granulator.
D