Bryant 355MAV Furnace User Manual


 
CHECKLIST—INSTALLATION
Load Calculation Condensate Drain
_______
_______
_______
Heating Load (Btuh)
Cooling Load (Btuh)
Furnace Model Selection
_______
_______
_______
_______
_______
Unit Level or Pitched Forward
Internal Tubing Connections Freeof Kinks and Traps
External Drain Connection Leak tight and Sloped
Condensate Trap Primed before Start-Up
Heat Tape Installed if Required
COMBUSTION AND VENT PIPING
Terminal Location
CHECKLIST—START-UP
_______
_______
______
______
______
______
______
______
Roof or Sidewall
Termination Kit — 2 Pipe or Concentric
Combustion-Air Pipe Length
Combustion-Air Elbow Quantity
Vent Pipe Elbow Quantity
Pipe Diameter Determined from
Sizing Table
Pipe Sloped to Furnace
______
______
Gas Input Rate(Set Within 2 percent of RatingPlate)
Temperature Rise Adjusted
Pipe Insulation Thermostat Anticipator
______
______
Over Ceilings
Low-Ambient Exposed Pipes
______
______
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)Selected
Safety Controls Check Operaton
______
______
Primary Limit
Pressure Switch
—59—