GE AF-300 Sewing Machine User Manual


 
-
7
-
Instruction on maintenance/inspection, and replacement
!
WARNING
1. Do not commence inspection work until at least five minutes after the power has been
turned off (open).
(In addition, make sure that the charge lamp has gone off and check that the DC voltage
between terminals P(+) and N(-) does not exceed 25V DC.)
Otherwise electric shock could occur.
2. Only qualified personnel should perform maintenance and inspection or replacement opera-
tions.
(Take off all metal objects (watch, ring, etc.) before starting.)
(Use well-insulated tools.)
Otherwise electric shock or injury could occur.
3. Never modify the product,
otherwise electric shock or injury could occur.
Instruction on disposal
!
CAUTION
1. Since this product contains lead solder, it must be treated as industrial waste when
it is disposed of. Entrust it to a waste processing company when disposing it.
General instructions
1. The figures in this operation manual may show the drive with covers and safety screens re-
moved to explain the structure in details. Therefore, be sure to replace the covers and
screens to their original positions and operate the drive according to the instruction manual.