GE AF-300 Sewing Machine User Manual


 
-
75
-
(2) Insulation test in the control circuit
The megger test and the dielectric strength test must not be executed in the control circuit because those parts
will be damaged and cannot be repaired.
Use a high-resistance multimeter for the control circuit.
1 Remove all external wiring from the control circuit terminals.
2 Execute a continuity test between grounds. If the result is 1M or more, it is normal.
(3)External main circuit and sequence control circuit
Remove wiring from all the terminals of the drive in order not to apply the test voltage to the drive.
8-5 Inquiries about Products and Product Warranty
(1) Inquiries
If there is damage, a fault in the product, or questions concerning the product, contact your local distributor or GE
Fuji. Be prepared to supply the following information:
a) Drive type
b) Serial No. (equipment serial number)
c) Purchase date
d) Inquiry details (e.g., damaged part, extent of damage, questions, status of fault)
(2) Product Warranty
The warranty period is one year after purchase or 18 months from the year and month of manufacture on the
nameplate, whichever expires first.
However, the guarantee will not apply in the following cases, even if the guarantee term has rot expired:
1 .Damage was caused by incorrect use or inappropriate repair and modification.
2. The product was used in an environment outside the standard specified range.
3. Damage was caused by dropping the product after purchase or occurred during transportation.
4. Damage was caused by an earthquake, fire, flooding, lightning, abnormal voltage or other natural calamities and
secondary disasters