Weil-McLain 550-141-850/0599 Boiler User Manual


 
57Part number 550-141-850/0699
Installation Start-Up Parts Maintenance
Service technician
(see following pages for instructions)
Owner maintenance
(see following pages for instructions)
A
NNNUAL
START
-
UP
Inspect:
• Any problems reported by owner
• Boiler area
• Air openings
• Flue gas vent
• Boiler heating surfaces
• Water piping
• Condensate drain system
Service:
• Lubricate blower motor
• Lubricate any circulators requiring oil
Start-up:
• Perform start-up per manual
Check/test:
• Check gas piping for leaks
• Check cold fill & operating pressures
• Check temperature mixing system
• Check/maintain components - vents,
limits, expansion tank, gauges, igniter
• Inspect & operate relief valve
Review:
• Review maintenance procedures with
owner
Daily
• Check boiler area
• Check air openings
• Check pressure gauge
Monthly
• Check boiler interior piping
• Check venting system
• Check air vents
• Check condensate drain system
• Check relief valve
Periodically
• Test low water cutoff (if used)
• Clean vent termination/air intake
screens
Every 6 months
• Oil blower motor
• Operate relief valve
End of season • Shut down procedure
Table 4 Service and maintenance schedules
Service and maintenance scheduleXb