Brother BES-962BC Sewing Machine User Manual


 
Chapter 2 Preparation of Embroidery Machine
BES-962BC BES-1262BC
29
2-2 Installation of Machine
1. Place an adjustment bolt base r, a rubber
cushion 10 e (provided with the machine),
and PE sheet w under each of four
adjustment bolts M20 q. The adjustment
bolt base must be on the rubber cushion.
2. Fit four adjustment bolts M20 q into the
conical dents of adjustment bolt bases r,
and adjust the embroidery machine in
height.
The adjustment must be made in such a
manner that the four bolts are under an
equal load when the machine is placed
down. (To lower adjustment bolt M20 q,
turn it in the direction of the arrow.)
Also, the casters should be raised by
several millimeters.
3. After adjusting four adjustment bolts M20
q, turn nuts M20 t in the direction of the
arrow to fasten them.
Note) If the floor is not strong enough, the embroi-
dery machine may be rocked during opera-
tion. In such a case, it is recommended that a
secure base of concrete be placed below the
embroidery machine.
t
e
r
q
w