4 Introduction
Thank you for purchasing the Mx-1000
conventional control panel. The Mx-1000
range of panels
have been designed, manufactured and tested to meet the requirements of BSEN 54 Parts 2 & 4
and will provide the user with many years of reliable service.
This document contains all the information necessary for the installation, commissioning and
maintenance of the Mx-1000
range of panels and repeaters.
NOTE: It is important to read this manual fully before commencing installation.
The following supporting documentation is also available:
• Mx-1000
Sales Literature
• Mx-1000
Panel Application Guide (Doc. No. 680-077)
• Mx-1000
User Manual (Doc. No. 680-072)
• Wiring Recommendations
5 Overview of Installation and Commissioning
This section lists the steps that are taken in designing, installing and commissioning a Mx-1000
system.
1. Install all field wiring and equipment
● Refer to the Installation Guidelines in section 12.2 below.
● Refer to the field device installation manuals
2. Install the panel
● Refer to the installation instructions in section 12.2 below.
● Do not connect the field equipment at this stage.
3. Connect any repeaters (if applicable)
● Refer to the installation instructions in section 12.2 below.
4. Commission the panel
● Refer to Commissioning in section 13 below.
Page 4 of 40