BRK electronic Mx-1000 Smoke Alarm User Manual


 
4 Introduction
Thank you for purchasing the Mx-1000
conventional control panel. The Mx-1000
range of panels
have been designed, manufactured and tested to meet the requirements of BSEN 54 Parts 2 & 4
and will provide the user with many years of reliable service.
This document contains all the information necessary for the installation, commissioning and
maintenance of the Mx-1000
range of panels and repeaters.
NOTE: It is important to read this manual fully before commencing installation.
The following supporting documentation is also available:
Mx-1000
Sales Literature
Mx-1000
Panel Application Guide (Doc. No. 680-077)
Mx-1000
User Manual (Doc. No. 680-072)
Wiring Recommendations
5 Overview of Installation and Commissioning
This section lists the steps that are taken in designing, installing and commissioning a Mx-1000
system.
1. Install all field wiring and equipment
Refer to the Installation Guidelines in section 12.2 below.
Refer to the field device installation manuals
2. Install the panel
Refer to the installation instructions in section 12.2 below.
Do not connect the field equipment at this stage.
3. Connect any repeaters (if applicable)
Refer to the installation instructions in section 12.2 below.
4. Commission the panel
Refer to Commissioning in section 13 below.
Page 4 of 40