Part III: 1-49
Oil in Water Part III
Teledyne Analytical Instruments
pumps. (Some pumps depending upon their
application requirements, may be required to
supply high flow, high differential pressures, high
suction (lift) or head pressures and high absolute
operating pressures). Because of this and other
functions, certain pumps may not be allowed to run
dry. (Consult factory for recommendations on your
particular pump used).
4 Recommend instrument power source be within+/-
10% of recommended nominal line voltages and
current.
5 Recommend spacing be made available for
maintenance and access thereof, i.e., cabinet door
openings, etc.
6 Sample tap requirements:
a) Heat tracing to prevent freezing of
water(s), or salt laden produced or rig-wash
sample fluids
b) Proper gravity fed lines as indicated above
c) Drain openings or returns for the system
that won’t plug
d) Sampling probes to be placed for
homogenous and representative extraction without
stagnation or dead-volumes and to prevent
entrained air, suspended solids withdrawal
without using fine filters which could remove oil
being measured.
B Installation:
1 Electrical connections-