Wayne-Dalton 9800 Series Garage Door Opener User Manual


 
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your local
yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
10
Preparing the Opening
TRACK TYPE TorqueMaster
®
15” Radius track 12-1/2” (318 mm)
P5
Recommended
tools from
page 5
HEADROOM REQUIREMENT
BACKROOM REQUIREMENT
WEATHER SEAL
HEADROOM
BACKROOM
DOOR
WIDTH
DOOR HEIGHT
LEVEL HEADER
PLUMB JAMBS
HEADER BOARD
2” X 6” LUMBER
PREFERRED
SUITABLE MOUNTING
SURFACE 2” X 6”
LUMBER MINIMUM
HEADER
JAMB
JAMB
QUICK INSTALL TRACK
FULLY ADJUSTABLE TRACK
JAMB
WEATHER
SEAL
1/8” TO 1/4”
WEATHER
SEAL
JAMB
DOOR
STOP
DOOR
STOP
DOOR
SECTION
DOOR
SECTION
JAMB
JAMB
1/8” TO 1/4”
DOOR HEIGHT TRACK
MANUAL
LIFT
MOTOR
OPERATED
8’0” 15” Radius
110”
(2794 mm)
137”
(3479 mm)
If you just removed your existing door or you are installing a
new door, complete all steps in PREPARING THE OPENING.
To ensure secure mounting of track brackets, side
and center brackets, or steel angles to new or retro-fit
construction, it is recommended to follow the procedures
outlined in DASMA Technical Data Sheets #156, #161 and
#164 at www.dasma.com.
The inside perimeter of your garage door opening should
be framed with wood jamb and header material. The jambs
and header must be securely fastened to sound framing
members. It is recommended that 2” x 6” lumber be used.
The jambs must be plumb and the header level. The jambs
should extend a minimum of 12” (305 mm) above the top of
the opening for TorqueMaster counterbalance systems. For
low headroom applications, the jambs should extend to the
ceiling height. Minimum side clearance required, from the
opening to the wall, is 3-1/2” (89 mm).
IMPORTANT: CLOSELY INSPECT JAMBS, HEADER AND
MOUNTING SURFACE. ANY WOOD FOUND NOT TO BE SOUND,
MUST BE REPLACED.
For TorqueMaster counterbalance systems, a suitable
mounting surface (2” x 4”) must be firmly attached to the
wall, above the header at the center of the opening.
NOTE: Drill a 3/16” pilot hole in the mounting surface to
avoid splitting the lumber. Do not attach the mounting
surface with nails.
Weather seal (may not be included) / Door stop:
Cut the weather seal or door stop (if necessary) to fit header
and jambs.
For quick install track: Align the header seal with the inside
edge of the header and temporarily secure it to the header
with equally spaced nails. Next, fit the jamb seals up tight
against the header seal and flush with the inside edge of the
jamb. Temporarily secure the jamb seals with equally spaced
nails approximately 12” to 18”. This will keep the bottom
section from falling out of the opening during installation.
For fully adjustable track: Align the header seal 1/8” to
1/4” inside the header and temporarily secure it to the
header with equally spaced nails. Next, fit the jamb seals
up tight against the header seal and 1/8” to 1/4” inside the
jamb. Temporarily secure the jamb seals with equally spaced
nails approximately 12” to 18”. This will keep the bottom
section from falling out of the opening during installation.
NOTE: Do not permanently attach weather seal or door stop
to the jamb at this time.
HEADROOM REQUIREMENT: Headroom is defined as the
space needed above the top of the door for tracks, springs,
etc. to allow the door to open properly. If the door is to be
motor operated, 2-1/2” (64 mm) of additional headroom is
required.
NOTE: 6” LHR Conversion Kit is available for 12” Radius only.
Contact your local Wayne-Dalton dealer.
BACKROOM REQUIREMENT: Backroom is defined as the
distance needed from the opening back into the garage to
allow the door to open fully.