Installation checklists
Required supplies
Table 15 lists the supplies required for all Tracker installations.
Optional supplies
Table 16 lists the supplies that may or may not be necessary, depending
on the Tracker installation.
Table 15. Required supplies checklist
;
Wiring installation Item
24 Vac
18 AWG (1.02 mm
2
) wire recommended
24 Vac, 40 VA minimum transformer
Comm Communication wire (see Table 7 on page 30
and Table 8 on page 31 for specifications)
Table 16. Optional supplies checklist
;
Inputs/output
wiring installation
Item
Alarm relay wiring
18 AWG (1.02 mm
2
) wire and metal conduit
Priority shutdown
wiring and
Meter input
18—22 AWG (1.02 mm
2
—0.643 mm
2
) wire and
metal conduit
Thermistor wire
18—22 AWG (1.02 mm
2
—0.643 mm
2
) twisted
pair, shielded wire
Alarm relay power
supply
Power supply for alarm relay output (not to
exceed 24 Vac)
Alarm relay output
load
Load for alarm relay output (not to exceed
1 amp at 24 Vac)