Trane Building Automation System Thermostat User Manual


 
®
Chapter 1 Overview
12 BMTK-SVN01D-EN
Before installation
Before beginning to install the Tracker controller, make sure that you
have all the necessary controller components and that they are
undamaged. Also, take steps to protect components until they are needed.
IMPORTANT
Before you install the Tracker hardware, review this guide and other
Tracker support literature and create an installation plan.
Verify the shipment
When the shipment arrives at the job site, carefully unpack the carton.
Even though outgoing orders are thoroughly reviewed before leaving the
factory, compare the items in the shipment with the shipping
authorization paper and verify that all items are present.
Verify that the controller model received is the model that you ordered
and write down the model number for use later.
Inspect for shipping damage
Inspect the items in the shipment to verify that no shipping damage or
loss occurred. If your inspection reveals damage or material shortage:
Make the appropriate notation on the carrier delivery receipt.
Immediately file a claim with the carrier, specifying the extent and
type of damage and/or shortage found.
Notify the appropriate Trane representative.
Store unused components until needed
CAUTION
Avoid Equipment Damage!
Store all Tracker components off-site until most or all of the building
construction is complete. Failure to do so could result in damage to
components.
The termination module is shipped detached from the main module and
display module assembly. To protect the controller from damage, Trane
recommends storing the main module and display module assembly away
from the construction and/or installation site to prevent it from being
damaged or lost. Verify that the storage site conforms to the specifications
shown in Table 1 on page 9.
Note:
Contact your sales office to order additional Tracker literature,
if needed.