Baxi Potterton Gold FSB 30 HE Boiler User Manual


 
13.0 Completion
38
© Baxi Heating UK Ltd 2011
13.1 Fitting The Case Panels & Facia
1. Refit the case top panel and front door, securing with
the screws previously removed (Fig.37).
2. Locate the facia panel and secure with the screws
previously removed (Fig. 38).
3. The “Important Ventilation Information” label can be
removed unless the boiler is installed in an unventilated
compartment.
13.2 ‘Benchmark’ Checklist
1. Carefully read and complete all sections of the
Benchmark Commissioning Checklist at the rear of this
publication that are relevant to the boiler and
installation. These details will be required in the event
of any warranty work. The publication must be handed
to the user for safe keeping and each subsequent
regular service visit recorded.
2. For IE, it is necessary to complete a “Declaration of
Conformity” to indicate compliance to I.S. 813. An
example of this is given in I.S. 813 “Domestic Gas
Installations”. This is in addition to the Benchmark
Commissioning Checklist.
13.3 Handover
1. Instruct the user in the operation of the boiler and
system controls. Hand over the User’s Operating,
Installation and Servicing Instructions, giving advice on
the necessity of regular servicing.
2. Demonstrate to the user the action required if a gas
leak occurs or is suspected. Show them how to turn off
the gas supply at the meter control, and advise them
not to operate electric light or power switches, and to
ventilate the property.
3. Show the user the location of the system control
isolation switch, and demonstrate its operation.
4. Advise the user that they may observe a plume of
vapour from the flue terminal, and that it is part of the
normal efficient operation of the boiler.
Outercase Securing
Screws
Fig. 37
Fig. 38
Facia Securing Screws