Baxi Potterton Gold FSB 30 HE Boiler User Manual


 
10.0 Installation
31
© Baxi Heating UK Ltd 2011
10.5 Fitting the Standard Flue (Cont)
7. Ensure the inner flue support bracket is positioned
in the flue (Fig. 28).
8. Engage the flue into the flue elbow using soap
solution to ease the engagement, ensuring the flue
terminal is positioned as shown (Fig. 29).
9. Place the gasket over the flue exit on the boiler.
10. Slide the flue assembly through the hole in the wall.
11. Engage the elbow on to the flue connection on top
of the boiler. Secure with the four screws supplied in
the kit.
12. Make good between the wall and air duct outside
the building ensuring the 3° drop between the terminal
and elbow.
13. The flue trim should be fitted once the installation
is complete and the flue secure (Fig. 30). Apply a
suitable mastic to the inside of the trim and press
against the wall finish, making sure the brickwork is
dust free and dry.
14. If necessary fit a flue plume deflector kit and/or
terminal guard (see Sections 7.6 & 8.8).
Gasket
Flue Trim
Inner Flue Support Bracket
Flue
Flue Elbow
Fig. 28
Fig. 30
Fig. 29
Shaded Areas indicate
Recommended Handling
Points