Hearth and Home Technologies SL-750TR-D Furnace User Manual


 
17
Heat & Glo • SL-550 / 750 / 950TR-D • InD • 2044-985 Rev. M • 10/06
Figure 5.7
NOTE: If installing a vertical vent/termination off the top of
the appliance, the optional vertical termination baf e should
be used.
CAP
V
1
V
1
= 44 ft. Max. (13.4 m)
Top Vent - Vertical Termination
No Elbows
Baf e Instruction
1. Install the baf e over the center of the exhaust outlet in
the rebox (see Figure 5.8).
2. Center the exhaust opening in the open end of the
baf e, and secure through the slots on the baf e with
the 2-1/4 in. self tapping screws provided.
Baf es are recommended for these vertically terminated
products which have excessive draft. Baf es compensate
for high draft, restore visual ame height, and limit exces-
sive cooling resulting from too much secondary air. Refer
to the allowable vent con gurations in the model speci c
installer’s guide for recommended use of this baf e.
Note: Use SL D- Series
components only.
BAFFLE
VIEW FROM
UNDERNEATH
SIDE VIEW
FIREBOX
BACK
EXHAUST
FIREBOX
BACK
BAFFLE
FRONT
OF UNIT
Figure 5.8