Conair Portable Chillers Series 1Water-Cooled (W1) and Air-Cooled Models (A1) withTIC Control Air Conditioner User Manual


 
B
EFORE
STARTING
UGH016/0500 Series 1 Portable Chillers, TIC Control
OPERATION 4-3
Before you start daily operation of the chiller, you need to
perform scheduled preventative maintenance. Necessary main-
tenance is describe in the Maintenance section of this Users
Guide.
WARNING: Electrical hazard
Be sure that power to the chiller is OFF when
doing any maintenance on the chiller. Follow all
safety rules when performing any maintenance
on this equipment.
Daily maintenance includes:
Checking electrical connections
Checking process fluid level in the pump tank
Checking the condenser coil for debris
Verifying pump discharge pressure
Inspecting piping for leaks
NOTE: The daily, weekly, monthly, and semi-annual mainte-
nance procedures are detailed in the Maintenance section. Go
there for detailed preventative maintenance.
Before starting the Chiller be sure to:
Open the To Process valve
to the full open position.
Open the From Process valve
to the 3/4 open position. You will need to adjust this
valve when the chiller is running to obtain the desired
pump discharge pressure. To find the approximate
water flow, refer to the Pump Curves in Description
section.
From Process valve
To Process valve
Check that the casters are locked.