Wayne-Dalton 9300 Garage Door Opener User Manual


 
15
Tools Needed:
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
14
Adjusting Top Bracket Slide
With horizontal tracks installed, you can now
adjust the top bracket slides.
Vertically align the top section of the door with
the lower sections. Once aligned, position the top
bracket slide, out against the horizontal track.
Maintaining the top bracket slide’s position,
tighten the (2) 1/4” - 20 x 1” carriage bolts and (2)
1/4” - 20 nylock nuts.
CORRECT
7/16” Wrench
Step Ladder
TOP
SECTION
INCORRECT
13
TOP
SECTION
INT.
SECTION
INT.
SECTION
HORIZONTAL
TRACK
ROLLER
TOP BRACKET
SLIDE
TOP
SECTION
TorqueMaster
®
Spring Tube
Assembly
TorqueMaster
®
springs come lubricated and pre-
assembled inside the Torquemaster
®
spring tube
assembly.
To install, lay the Torquemaster
®
spring tube
assembly on the floor (inside garage) in front of the
door with the labeled end to the left.
LABELED END
TORQUEMASTER
®
SPRING TUBE
ASSEMBLY
None
(2) CARRIAGE BOLTS
AND NUTS