Wayne-Dalton 9300 Garage Door Opener User Manual


 
11
Tools Needed:
Tools Needed:
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
Bottom Section
Center the bottom section in the door opening.
Level section using wooden shims (if necessary)
under the bottom section.
Level
Wooden shims
(If necessary)
6
7
Vertical Track
IMPORTANT: THE TOPS OF THE
VERTICAL TRACKS MUST BE LEVEL
FROM SIDE TO SIDE. IF THE BOTTOM
SECTION WAS SHIMMED TO LEVEL IT.
THE VERTICAL TRACK ON THE SHIMMED
SIDE, MUST BE RAISED THE HEIGHT OF
THE SHIM.
Position the left hand vertical track assembly
over the rollers of the bottom section. Make sure
the counterbalance cable is located between the
rollers and the door jamb. Drill 3/16” pilot holes for
the lag screws.
Loosely fasten jamb brackets and flagangle to the
jamb using 5/16” x 1-5/8” lag screws. Tighten
lag screw securing bottom jamb bracket to jamb,
maintaining 3/8”- 5/8” track spacing.
NOTE: Hang cable drum over flagangle.
Repeat for the right hand side.
3/16” Drill Bit
Power Drill
7/16” Socket Driver
Tape Measure
Level
Step Ladder
BOTTOM
SECTION
DOOR OPENING
WITH WEATHER SEAL
WOODEN SHIMS
(IF NECESSARY)
LEVEL
BOTTOM
SECTION
5/16” X 2”
LAG SCREWS
FLAGANGLE
VERTICAL
TRACK
ASSEMBLY
JAMB
BRACKET
BOTTOM
SECTION
VERTICAL TRACK
ROLLER
3/8”-5/8”
15R QI FLAGANGLE
12R QI FLAGANGLE
12R & 15R FULLY
ADJUSTABLE FLAGANGLE
LAG
SCREW
LOCATIONS
LAG
SCREW
LOCATIONS
LAG
SCREW
LOCATIONS
LAG
SCREW
QUICK INSTALL
JAMB BRACKET