Trane RT-SVX19A-E4 Thermostat User Manual


 
Installation
RT-SVX19A-E46
General information :The
installation must conform to all
local standards and regulations.
Reception of units
Rooftop unit
The unit is supplied on a wooden
frame. It is recommended to check
the machine's condition upon
reception.
There are two ways to handle the
unit:
1. Use the openings in the wooden
frame to handle the machine
using a fork lift, in accordance
with applicable safety
regulations.
2. Use a lifting beam correctly
adjusted to fit the unit
(Figure 1a).
Unit handling
The units are supplied on the truck
but are not unloaded. An opening is
provided on each corner of the unit
base to facilitate handling.
4 shackles and 4 slings are required.
Use a lifting beam to prevent the
cables pressing too hard on top of
the unit during lifting.
Figure 1a indicates the position of
the center of gravity and the lifting
recommendations.
Important: For unit to fit on the
roof curb the fork lift pockets must
be removed.
Figure 1a - Unit handling
1 = Clevis
2 = Base Rail
3 = Spreader Bar
L = Length (Center of Gravity)
W = Width (Center of Gravity)
Refer to Table 2 for weights and center of gravity.
A
B