Toshiba RAV-SM1404UT-E Air Conditioner User Manual


 
– 202 –
Wrap the ferrite core with the compressor lead wire
for 4 times.
Compressor lead
Compressor lead
Ferrite core
0 to 50
(Compressor lead positioning standard)
0 to 500 to 50
Pass through sound-
insulation plate
(rolling out) between
suction pipe and
header pipe.
Put the end of sound-
insulation plate
(rolling out) on the other
end at this position.
Header pipe
Header pipe
Suction pipe
Suction pipe
Discharge pipe
Pass through sound-insulation plate (rolling in)
between compressor and discharge pipe,
suction pipe and then put the end of sound-
insulation plate on the other end at this position.
There should be no clearance between sound-
insulation plate (upper) and sound-insulation plate
(rolling out).
Sound-insulation plate
Sound-insulation plate
(upper)
(upper)
Cultur
Cultur
al r
al r
ivet
et
Inser
Inser
t one side
t one side
under cultur
under cultur
al r
al r
ivet.
et.
Sound-insulation plate
Sound-insulation plate
(rolling out)
(rolling out)
SW804
SW804
SW801
SW801
Compressor lead
Header pipe
Suction pipe
Sound-insulation plate
(upper)
Cultural rivet
Insert one side
under cultural rivet.
Sound-insulation plate
(rolling out)
SW804
SW801
No.
6
Part name
Compressor
Compressor
lead
(Continued)
Procedure
2. Mounting of compressor
1) Mount the compressor in the reverse
procedure for removal.
NOTE :
After replacement of the compressor, be
sure to replace the compressor lead.
(Repair part code of compressor lead:
43160591)
In this time, wrap the ferrite core with the
compressor lead wire by 4 times.
As shown in the right figure, mount the
sound-insulation plate (rolling in, rolling
out) by passing through it between the
compressor and the piping, and between
the piping and the partition board.
Fix TD sensor by the bundling band for
heat-proof on the market via the pipe
cover so that TD sensor does not directly
come to contact with the discharge pipe.
3. Vacuuming
1) Connect the vacuum pump to the charge
port and the check joint of the gas pipe
valve and then drive the vacuum pump.
2) Carry out vacuuming until the vacuum low
pressure gauge indicates 1 (mmHg).
NOTE :
Before vacuuming, open PMV fully.
If PMV is closed, vacuum may be impossible
between liquid pipe valve and PMV of the
outdoor unit.
Forced full-opening method of PMV
Turn on the leakage breaker.
Turn on 1 and 3 of Dip switch SW804 on the
control P.C. board of the outdoor unit.
Keep pushing SW801 on the control P.C. board
of the outdoor unit for 1 second or more.
After pushing SW801 for 1 second or more,
turn off the leakage breaker within 2 minutes.
4. Refrigerant charge
1) Add the refrigerant amount determined by
the pipe length from the charge port of the
valve.
Remarks