Toshiba RAV-SM1404UT-E Air Conditioner User Manual


 
– 199 –
Bundling band
(Compressor lead, Reactor lead)
Bundling band
(Compressor lead, Reactor lead)
Control P.C. board Reactor lead
Reactor lead
Reactor body
Bundling band
(Fan motor lead, Reactor lead)
Fan motor lead
No.
4
Part name
Replacement of
electric parts
(Continued)
Procedure
2. Reactor
1) Carry out work of 1 of
1
.
2) Remove the reactor lead connected to
the control P.C. board.
CN05 White, CN06 White
3) Cut the bundling band which bundled
the compressor lead and fan motor
lead.
4) Remove the reactor.
(Trust B tight screw, Ø4 × 6, 2 pcs.)
5) Replace the reactor with a new one.
NOTE :
Be sure to bundle the removed bundling
band with the bundling band on the
market.
Be careful so that the fan motor lead
does not come to contact with the
reactor body.
Remarks