Mamiya C28 Boiler User Manual


 
To comply with the Building Regu latio ns, each section must h ave a tick in one or o ther of the b oxesCONTROLS
BOILER SERIAL No. NOTIFICATION No.
BENCHMARK No.
FOR ALL BOILERS CONFIRM THE FOLLOWING
FOR THE CENTRAL HEATING MODE, MEASURE & RECORD
FOR COMBINATION BOILERS ONLY
FOR THE DOMESTIC HOT WATER MODE, MEASURE & RECORD
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING
FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING
COMMISSIONING ENG’S NAME
GAS BOILER COMMISSIONING CHECKLIST
TIME & TEMPERATURE CONTROL TO HEATING
TIME & TEMPERATURE CONTROL TO HOT WATER
HEATING ZONE VALVES
HOT WATER ZONE VALVES
THERMOSTATIC RADIATOR VALVES
AUTOMATIC BYPASS TO SYSTEM
ROOM T/STAT & PROGRAMMER/TIMER
CYLINDER T/STAT & PROGRAMMER/TIMER
PROGR AMMABLE ROOMSTAT
FITTED
COMBI BOILER
NOT REQUIRED
FITTED NOT REQUIRED
FITTED
FITTED NOT REQUIRED
THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOILER MANUFACTURER’S INSTRUCTIONS ?
THE SYSTEM CLEANER USED
THE INHIBITOR USED
GAS RATE
BURNER OPERATING PRESSURE (IF APPLICABLE)
CENTRAL HEATING FLOW TEMPERATURE
CENTRAL HEATING RETURN TEMPERATURE
m
3
/hr ft/hr
N/A mbar
°C
°C
HAS A WATER SCALE REDUCER BEEN FITTED?
WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED?
YES NO
GAS RATE
MAXIMU M BURNER OPERATING PRESSURE (IF APPLICABLE)
COLD WATER INLET TEMPERATURE
HOT WATER OUTLET TEMPERATURE
m
3
/hr ft/hr
N/A mbar
°C
°C
WATER FLOW RATE lts/min
THE CONDENSATE DRAIN HAS BEEN INSTALLED IN AC CORDANCE WITH
THE MANUFACTURER’S INSTRUCTIONS?
YES
THE HEATING AND H OT WATER SYSTEM COMPLIES
WITHPARTS4&7OFTHEBUILDINGREGULATIONS
THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN INSTALLED AND COMMISSIONED
IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS
IF REQUIRED BY THE MANUFACTURER, HAVE YOU RECORDED A CO/CO
2
RATIO READING? CO/CO
2
RATIOYESN/A
THE OPERATION OF TH E APPLIANCE AND SYSTEM
CONTR OLS HAVE BEEN DEMONSTRATED TO THE CUSTOMER
THE MANUFACTURER ’S LITERATURE HAS BEEN LEFT WITH THE CUSTOMER
PRINT CORGI ID No.
SIGN DATE