62 Ceiling & Floor, Ceiling Suspended (50Hz, R22)
15. Installation
R
•
Before working, refer to "Flaring Work"
on page 74
R
Hook
Cabinet Bottom
R
R
Inlet hanger
• Secure the unit to the Installation Plates with four M8 bolts and
washers.
• Fit the projection hooks of the side plates to the 'Side Panel'
• Fasten the screws.
• Hook up the Inlet Grille Hook to the cabinet.
• Hang the Inlet Hanger to the screw.