LG Electronics 5CSV2-03A Air Conditioner User Manual


 
42 Ceiling & Floor, Ceiling Suspended (50Hz, R22)
9. Selection Procedure
Step 1. Determine cooling load requirements at design conditions.
Required load conditions:
Required cooling capacity (TC)...................................25,000 Btu/h
Sensible capacity (SHC) ............................................19,000 Btu/h
Temperature air entering Outdoor Unit.......................95°F
Temperature air entering Indoor Unit .........................80°F DB/67°F WB
DB dry bulb temperature
WB wet bulb temperature
Step 2. Select unit based on required cooling capacity.
Based on Total Cooling Capacity, choose suitable model from the specification table.
The model with a nominal net capacity of 28,000 Btu/h cooling is selected.
The system consists of a LV-B2860CL.
Verify the unit performance at the given conditions in accordance with step #3.
Step 3. Determine if system selected satisfies cooling requirements.
Enter cooling capacities table on page 44 at high speed and 95°F outdoor entering air temperature with
80°F DB/67°F WB indoor entering air temperature.
Total cooling capacity = 28,000 Btu/h, Sensible capacity=21,600 Btu/h
To find capacity at intermediate conditions not in the table ;
Interpolation should be used when design conditions are between two numbers that are in the capacity
table.
Extra-polation is not recommended.
If the interconnecting piping length is more than 7.5m ;
Find the capacity(%) at that particular interconnecting piping length from the coefficient of capacity change
graph, on page 51.
Multiply coeffienct factor with Total Cooling Capacity & Sensible Capacity.
Ex: At 20m interconnecting piping length, from coefficient of capacity change graph, coeffienct factor is
0.94.
Total Cooling Capacity =
Capacity (%) x Total Cooling Capacity
=
94x28000
=26,320Btu/h
100 100
Sensible Capacity =
Capacity (%) x Sensible Capacity
=
94x21600
=20,304Btu/h
100 100