LG Electronics 5CSV2-03A Air Conditioner User Manual


 
60 Ceiling & Floor, Ceiling Suspended (50Hz, R22)
15. Installation
Insert the nuts and washer onto the suspension
bolts for locking the suspension bolts on the ceiling.
Mount the suspension bolts to the anchor-nuts firm-
ly.
Secure the Installation plates onto the Suspension
bolts (adjust level roughly.) using nuts, washers and
spring washers.
Engage 2 hooks on the both left and right side
of the unit to the lower slot of Installation
Plates.
Adjust a level with a level gauge on the direc-
tion of left-right, back-forth by adjusting sus-
pension bolts.
Move the hooks on the unit to the upper slot of
Installation Plates. Then the unit will be
declined to the bottomside so as to drain well.
Washer
Nut
Suspension
bolts
Ceiling
Anchor nut
Suspension
bolts
Spring
washer
max.
12mm
Washer
Nut
1)
2)
Suspension
bolt
Installation plate
Adjust a level
R
Level gauge
Lower slot
R
R
Upper slot