Baxi Potterton BBU 15 HE Boiler User Manual


 
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
CONTROLS Tick the appropriate boxes
Time and Temperature Control to Heating Room Thermostat and Programmable Load/Weather Optimum Start
remiT/remmargorP
Room Thermostat Compensation Control
remiT/remmargorP dna tatsomrehT rednilyC retaW toH ot lortnoC erutarepmeT dna
emiT Combination Boiler
dettiF sevlaV enoZ gnitaeH Not Required
dettiF sevlaV enoZ retaW toH Not Required
dettiF sevlaV rotaida
R citatsomrehT Not Required
dettiF metsyS ot ssapyB citamotuA Not Required
dedivorP kcolretnI relioB
ALL SYSTEMS
The system has been fl seY snoitcurtsni srerutcafunam reliob dna 3957SB htiw ecnadrocca ni denaelc dna dehsu
What system cleaner was used?
What inhibitor was used? Quantity litres
CENTRAL HEATING MODE Measure and Record:
Gas Rate
m
3
/hr OR
ft
3
/hr
)elbacilppa fi( erusserP gnitarepO renruB
mbar OR Gas Inlet Pressure mbar
Central Heating Flow Temperature °C
Central Heating Return Temperature °C
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)? Yes No
If yes, has a water scale reducer been fi tted? Yes No
What type of scale reducer has been fi tted?
DOMESTIC HOT WATER MODE Measure and Record:
etaR saG
m
3
RO rh/
ft
3
/hr
)etar mumixam ta( erusserP telnI saG RO rabm )etar mumixam ta( erusserP gnitarepO renruB mbar
erutarepmeT telnI retaW dloC °C
Hot water has been checked at all outlets Yes Temperature °C
etaR wolF retaW l/min
CONDENSING BOILERS ONLY
seY 8976SB/6455SB ro/dna snoitcurtsni srerutcafunam eht htiw ecnadrocca ni dellatsni neeb sah niard etasnednoc ehT
ALL INSTALLATIONS
OC gniwollof eht drocer ,rerutcafunam eht yb deriuqer fI
2
% OR CO ppm OR CO/CO
2
Ratio
seY snoitalugeR gnidliuB etairporppa eht htiw seilpmoc metsys retaw toh dna gnitaeh ehT
seY snoit
curtsni srerutcafunam eht htiw ecnadrocca ni denoissimmoc dna dellatsni neeb evah stcudorp detaicossa dna reliob ehT
seY remotsuc eht yb dootsrednu dna ot detartsnomed neeb evah slortnoc metsys dna rel
iob eht fo noitarepo ehT
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes
*
All installations in England and Wales must be notifi ed to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.
A Building Regulations Compliance Certifi cate will then be issued to the customer.
©Heating and Hotwater Industry Council (HHIC) www.centralheating.co.uk
Commissioning Engineer’s Signature
Customer’s Signature
(To confi rm satisfactory demonstration and receipt of manufacturer’s literature)
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
Customer Name Telephone Number
Address
Boiler Make and Model
Boiler Serial Number
Commissioned by (print name)
Company Name Telephone Number
Gas Safe Register licence No.
Company Address
Commissioning Date
To be completed by the customer on receipt of a Building Regulations Compliance Certifi cate
*
:
Building Regulations Notifi cation Number (if applicable)