Karcher 600 CD Water System User Manual


 
20
OPERATION OF THE SYSTEM WTC 600 LP / MP
Service Handbook 08.2004
3 Operation of the System
3.1 Assembly and Starting Operation
Assembly Chapter
Checking the scope of delivery (delivery note)
Placing the equipment in the set-up location and positioning
Connecting the untreated water to the WTC 600 LP/MP; connecting 2.2, 3.3.2.1, 3.3.1
the WTC 600 PI in between, if required (depending on delivery scope)
Installing the piping for backwashing and drinking water 2.2
Installing the float switch 3.3.2.4
Filling and connecting the sand filter and the activated carbon filter 3.4.2
Connecting the electrical system SLP, 3.3.2
Table 8 Assembly work to be carried out upon starting operation
Starting Operation Chapter
Establishing the untreated water supply 2.2
Manually actuating the sand filter backwashing 3.4.2
Manually actuating the activated carbon filter backwashing 3.4.2
Flushing the reverse osmosis 3.4.3.7
Filling the chemicals container 3.2
Adjusting the flow rates 3.4.3.8
Filling out the metering table in the operating instructions
Instructing the operator (operating instructions)
Table 9 Overview of start-up work
A water analysis with the following values must exist for commissioning of the WTC 600:
- Total hardness GH in °dH
- Iron Fe in mg/l
- Manganese Mn in mg/l
- Ammonium NH
4
or NH
3
in mg/l
- System yield determined by the sales department (Normal case: 75%, in special cases 50%).