IDEAL INDUSTRIES HE9 Boiler User Manual


 
classic HE - Installation & Servicing
27
INSTALLATION
40
CONDENSATE PIPE TERMINATION CONFIGURATIONS . . . continued
cla9253
BOILER
Air Break
3. INTERNAL CONNECTION TO SOIL AND VENT STACK
Termination into a down pipe can take place providing it can be
confirmed that the down pipe is part of a combined waste and rain
water system.
* Make connection to SVP using a solvent welded saddle.
BOILER
External
wall
Ground Level
Termination
to Soak away
cla7774
minimum
500mm
BOILER
External
wall
Ground Level
Open end of pipe
direct into gulley
below grating but
above water level
DRAIN
cla7775
4. TERMINATION TO SOAK AWAY
5. TERMINATION TO DRAIN / GULLEY
INSTALLATION
201850-6.pmd 21/02/2008, 12:5827