3
Hopper Lid
Outside Air
Knockout
(either side)
Boiler Drain
(Either Side)
Heat Exchange
Cleanout Cover
Flue Pipe - 3”
Pellet Vent
Combustion Blower
Temperature/
Pressure Gauge
Pressure Relief
Valve
Firebox Door
Control Board
Combustion Blower
Cover
Circuit Breaker
Power Cord
Heating System
Supply & Return
(either side)
Remote Zone
Control / OAT
Sensor Terminal
Firebox Draft
Test Port
Levelling Feet
Side Access
Panel
1- Controlled &
1-Un-controlled
120VAC Outlets