Installing Duct

EXAMPLE OF PIPING IN SERIES WITH
AN EXISTING OPERATIONAL BOILER
* BOILER DRAIN, 3/4" NPT MALE X 3/4" HOSE
* 3/4" NPT MALE PLUG
* TEMP/PRESSURE
GAUGE
PIPE TO WITHIN 6" OF THE FLOOR OR A
FLOOR DRAIN
* PRESSURE RELIEF VALVE
UNION
SHUT-OFF VALVE
UNION
* AUTOMATIC AIR VENT
NOTE: NOT SHOWN IN THIS DRAWING ARE ALL OF THE
ASSOCIATED PIPING AND CONTROLS THAT SHOULD
ALREADY BE IN PLACE WITH THE EXISTING BOILER SYSTEM.
FOR EXAMPLE, THE EXPANSION TANK, THE COLD WATER
SUPPLY , AIR REMOVAL SYSTEM ETC... IT IS EXTREMELY
IMPORTANT THAT THIS BOILER BE INSTALLED BY A
QUALIFIED INSTALLER AND THAT ALL EXISTING CONTROLS
AND SAFETY DEVICES ARE VERIFIED AS OPERATIONAL.
NOTE: ALWAYS REFER TO THE INDIVIDUAL COMPONENTS RECOMMENDED
INSTALLATION INSTRUCTIONS FOR THE PROPER MOUNTING POSITION AND
LOCATION WITHIN THE PIPING SYSTEM.
* ITEMS SUPPLIED
SYSTEM RETURN 3/4"
EXISTING BOILER
SHUT-OFF VALVE
SYSTEM SUPPLY 3/4"
OUT
IN
NOTICE: When installing with the Atmospheric Conversion, all of the pressurized
system components shown are not necessary. Air vents or bleeders should be
removed from the plumbing system to prevent air from entering the lines.
Control dipswitch #6 must be “ON”.
NOTE: Cold return water temperature (Sustained temperatures below 140 degrees
Fahrenheit) will lead to condensation or moisture in the firebox. This moisture can
lead to creosote formation. To help minimize moisture and creosote, it is strongly
recommended that some method of temperature balance is incorporated into the
return system.
EXAMPLE OF PIPING IN PARALLEL WITH
AN EXISTING OPERATIONAL BOILER
* BOILER DRAIN, 3/4" NPT MALE
X 3/4" HOSE
* 3/4" NPT MALE PLUG
SYSTEM RETURN 3/4"
SYSTEM SUPPLY 3/4"
* AUTOMATIC AIR VENT
* TEMP/PRESSURE
GAUGE
* PRESSURE RELIEF VALVE
PIPE TO WITHIN
6" OF THE
FLOOR OR A
FLOOR DRAIN
UNION
IN
UNION
SHUT-OFF VALVE
SHUT-OFF
VALVE
EXISTING
BOILER
BALANCING
VALVE
UNION
BALANCING
VALVE
UNION
OUT
NOTE: NOT SHOWN IN THIS DRAWING ARE ALL OF THE
ASSOCIATED PIPING AND CONTROLS THAT SHOULD
ALREADY BE IN PLACE WITH THE EXISTING BOILER
SYSTEM. FOR EXAMPLE, THE EXPANSION TANK, THE
COLD WATER SUPPLY , AIR REMOVAL SYSTEM ETC... IT IS
EXTREMELY IMPORTANT THAT THIS BOILER BE
INSTALLED BY A QUALIFIED INSTALLER AND THAT ALL
EXISTING CONTROLS AND SAFETY DEVICES ARE
VERIFIED AS OPERATIONAL.
* ITEMS SUPPLIED
NOTE: ALWAYS REFER TO THE INDIVIDUAL COMPONENTS
RECOMMENDED INSTALLATION INSTRUCTIONS FOR THE PROPER
MOUNTING POSITION AND LOCATION WITHIN THE PIPING SYSTEM.
NOTICE: When installing with the Atmospheric Conversion, all of
the pressurized system components shown are not necessary.
Air vents or bleeders should be removed from the plumbing
system to prevent air from entering the lines. Control dipswitch
#6 must be “ON”.
NOTE: Cold return water temperature (Sustained temperatures below 140 degrees
Fahrenheit) will lead to condensation or moisture in the firebox. This moisture can
lead to creosote formation. To help minimize moisture and creosote, it is strongly
recommended that some method of temperature balance is incorporated into the
return system.