Heat & Glo • 6000TRS-CE • 2049-900 Rev. Q • 2/1126
For Vertical Terminations - To locate the fl ue and
install the fl ue sections:
• Locate and mark the fl ue center point on the underside
of the roof, and drive a nail through the center point.
• Make the outline of the roof hole around the center point
nail.
• The size of the roof hole framing dimensions depend on
the pitch of the roof. There MUST BE a 2.5 cm clearance
from the vertical fl ue pipe to combustible materials.
• Mark the roof hole accordingly.
• Cover the opening of the installed fl ue pipes.
• Cut and frame the roof hole.
• Use framing lumber the same size as the roof rafters
and install the frame securely. Flashing anchored to the
frame must withstand heavy winds.
• Continue to install concentric fl ue sections up through
the roof hole and up past the roof line until you reach
the appropriate distance above the roof.
To seal the roof hole, and to divert rain and snow from
the fl ue system:
• Attach a fl ashing to the roof using nails, and use a non-
hardening mastic around the edges of the fl ashing base
where it meets the roof.
• Attach a storm collar over the fl ashing joint to form a
water-tight seal. Place non-hardening mastic around the
joint, between the storm collar and the vertical pipe.
• Slide the termination cap over the end of the fl ue pipe
and snap into place.
Figure 23 DVP Termination Cap