Heat & Glo • 6000TRS-CE • 2049-900 Rev. Q • 2/11 25
!
Figure 22. Venting through the Wall
• The heat shield sections will overlap to match the wall
thickness (depth). The small leg in the shield rests on
top of the fl ue to properly space it from the pipe section
(see Figure 22).
• The termination kit should pass through the wall fi re-
stops from the exterior of the building.
• Adjust the termination cap to its fi nal exterior position
on the building and interlock the fl ue sections.
EXTERIOR
INTERIOR
Interior
Wall Shield
Inner Flue
Rear Vent
Heat Shield
3.8 cm min.
overlap
Outer Flue
3.8 cm min.
Overlap
• Use a high-temperature sealant gasket to seal between
the pipe and exterior fi restop.
WARNING: THE TERMINATION CAP MUST
BE POSITIONED SO THAT THE ARROW IS
POINTING UP.