Emerson MINI-MATE2 Fan User Manual


 
Maintenance Inspection Checklist
63 Liebert
®
Mini-Mate2
10.0 MAINTENANCE INSPECTION CHECKLIST
Liebert Mini-Mate2
Signature:________________________________________________________________
Make photocopies of this form for your records
Date:____________________________________ Prepared By:____________________________________
Model #:_________________________________ Serial Number:__________________________________
NOTE
Reheat element sheaths and fins are manufactured with stainless steel. Regular inspections
are necessary to assure proper cleanliness of the reheating element. Should inspection reveal
corrosion particles on the reheating element or adjoining surfaces (including ducts and
plenums), appropriate cleaning should be performed. Periodic reheating element replacement
may be required to meet specific application requirements.
Monthly
Filters
___ 1. Check for restricted airflow
___ 2. Check for filter
___ 3. Wipe section clean
Fan Section
___ 1. Impellers free of debris and
move freely
___ 2. Bearings in good condition
___ 3. Check belt tension and
condition
Humidifier
___ 1. Check canister for mineral deposits
___ 2. Check condition of electrodes
___ 3. All hoses and fittings tight
___ 4. Check water make-up valve for leaks
Drain lines
___ 1. Check for obstructions and sediment
buildup.
___ 2. Check for damage and/or corrosion.
___ 3. Check for leaks
Semiannually
Compressor Section
___ 1. Signs of oil leaks
___ 2. Vibration isolation
Refrigeration Cycle
___ 1. Suction pressure
___ 2. Head pressure
___ 3. Superheat
___ 4. Evaporator coil clean
___ 5. Insulation intact
Air-Cooled Condensing Unit (if
applicable)
___ 1. Condenser coil clean
___ 2. Motor mount tight
___ 3. Refrigerant lines properly
supported
Flood Back Head Pressure Control
___ 1. Check refrigerant level
Water- or Glycol-Cooled Condensing Unit
___ 1. Water valve adjustment
___ 2. Water flow
___ 3. Water leaks
Glycol Pump (if applicable)
___ 1. Glycol leaks
___ 2. Pump operation
___ 3. Glycol solution
___ 4. pH level
Electric Panel
___ 1. Check electrical connections
___ 2. Operational sequence
Electric Reheat
1. Check element for corrosion