Energy Tech Laboratories F3 Boiler User Manual


 
17
Figure 17: Wiring Diagram for Water Boilers With Beckett AFG Burner and
Split Controls Less Tankless Heater
SEQUENCE OF OPERATION
A call for heat by the thermostat energizes the L7248C control which in turn energizes the primary control. The burner
will initiate ignition after completing a 15 second pre-purge cycle. If burner ignites within approximately 45 seconds
and the cad cell sees ame, the burner will continue to operate until the call for heat is satised or the setting of the
high limit is reached. The circulator will operate as long as the thermostat is calling for heat. If the thermostat is not
satised and the high limit is reached, the circulator will continue to operate, and the burner will stop until the high limit
is closed by a drop in boiler water temperature.
L. INSTALL ELECTRIC WIRING in accordance with
National Electrical Code and local regulations. A
separate electrical circuit must be run from the main
electrical service with an over-current device/disconnect
in the circuit. A service switch is recommended and
may be required by some local jurisdictions. Wiring
should conform to Figures 17 thru 19B.