78 Using a Field Communicator to configure the meter
Section 4: Configuring a 3818 LNG Meter Daniel 3818 LNG Liquid Ultrasonic Meter Installation Manual
May 2012 3-9000-771 Rev A
Procedure
1. Remove electrical power to the meter. If installed, remove the endcap security latches
and seals and then, remove the endcap.
2. Refer to the Field Communicator Users Manual wiring diagrams and commissioning
instructions provided with your handheld device. Register the product to activate the
end user license.
3. Fully charge the Field Communicator battery prior to use. Important: Do not change
the battery in a hazardous area environment. The power supply is not intrinsically safe
4. On the meter, run the wires through the field wiring conduit and into the transmitter
electronics enclosure.
Figure 4-21 3818 transmitter field wiring conduit entries
A. Field wiring conduit entries (8)
A.