m) To join FasNSeal to a 4” VH-1 terminal slip the female end of the FasNSeal pipe over the terminal connection so there is
an overlap of at least 1 ¾”. Tighten the hose clamp to mechanically lock the pipe onto the terminal. Apply and smooth
silicone over the outside of the joint including the hose clamp in the FasNSeal pipe.
n) Allow the silicone to cure for 24 hours before operating the boiler.
8) Condensate Traps:
a) Trap should have the basic configuration shown in Figure 25. All tubing is 3/8” I.D.
b) All drain tubing must be acid resistant.
c) At least the first 6 inches of tubing must be silicone with a 400F temperature rating.
d) Pipe condensate to a drain or other suitable location. Make sure that condensate disposal method is in accordance with
local regulations. Ensure condensate is not subjected to freezing temperatures.